English

Construction of the bypass in Podgorica begins soon

Podgorica

The Capital City of Podgorica and „Bemax“ company signed the contract on the construction of the South-West bypass.

It’s part of the road Podgorica – Petrovac which goes to the bridge on Morača river, and from the bridge all the way to the road Podgorica – Cetinje.

The bypass is 3.621,07 m long and is divided into three parts. Cross section of the road is defined with two lanes, 7 meters long, a partial island and pedestrian trails on both sides.

 

Send this to a friend