If everything goes as planned, all cells in KAP aluminium plant are to be shut down by 31 December, when Montenegro’s power supplier EPCG announced...
Tag - Montenegrin Power Transmission System (CGES)
The application of financial compensation, which consumers would be entitled to in case of a lower level of electricity quality, will start in August...
Power supply in Andrijevica, Plav and Gusinje has been normalised at 2.15 today, the Montenegrin Power Transmission System (CGES) announced. The...
Board of Directors of the Electric Power Company of Montenegro (EPCG) appointed Igor Novelic as the company’s CEO at today’s meeting. Noveljic has...
The Italian Terna company has started final works on the project of connecting Italy and Montenegro by a submarine power cable, Dnevne Novine reports...
The Terna company, which is currently working on the energetic connection between Italy and Montenegro in cooperation with Montenegro’s power grid...
The Italian company Terna has recently adopted the 2017 development plan which includes about €7.8bn investment in various projects. The company is...
Installing the submarine power cable between Italy and Montenegro, which connects the Balkans and the European Union, has been completed, the Terna...
The Italian Terna company is to end installing the third, central part of the submarine power cable between Italy and Montenegro, Pobjeda newspaper...