China Road and Bridge Corporation (CRBC) broke through Jabucki krs tunnel, CdM learns.
They broke through the right pipe in the length of 1.360 meters, and in several days, the left pipe (1.455 m) will be broken through as well.
Tunnel Jabucki krs is the fourth in size in the priority section of highway Bar-Boljare.
There will be 42 tunnels and 92 bridges constructed in the highway Bar-Boljare.
Priority section Smokovac-Uvac-Matesevo is 41 kilometers long.



